#32026D2253EU approval for Poland to waive GSM-R installation in the Chabówka–Nowy Sącz tunnel works until 31 December 2032
This Commission Implementing Decision under Directive (EU) 2016/797 accepts Poland’s request made on 6 November 2025 to disapply point 4.2.1.8(a) of Annex to Regulation (EU) No 1303/2014 for the modernisation of railway line No 104 Chabówka–Nowy Sącz. The specific derogation covers tunnel sections in sections C1 and D, from km 48+600 (existing km 49+822) to km 61+220 (existing km 63+965), where GSM-R would normally be required in tunnels over 1 km. Poland may use the alternative national rule allowing either GSM-R or the PKP radio system in tunnels, and the decision applies until 31 December 2032. Businesses involved in the project should note the stated additional cost of PLN 30,000,000 if the EU tunnel radio requirement were imposed, which the Commission accepted as a factor affecting the project’s economic viability.
AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.
Key Changes
- The Commission accepts Poland’s request to disapply point 4.2.1.8(a) of the Annex to Regulation (EU) No 1303/2014 for the modernisation of railway line No 104 Chabówka–Nowy Sącz.
- The derogation covers tunnel sections in parts C1 and D, specifically from km 48+600 (existing km 49+822) to km 61+220 (existing km 63+965).
- Poland may use the alternative national provision allowing either GSM-R or the PKP radio system in the tunnel instead of mandatory GSM-R-only installation.
Affected Parties
- Polish railway infrastructure managers and project contractors
- Suppliers of railway signalling and radio communication systems
- +3 more
Tags
rail interoperability · GSM-R · tunnel safety · +2