#2026-CA-13Temporary FM radio authorization for Bruyères FM in Sotteville-lès-Rouen
AI-generated summary for informational purposes only. Not legal advice. See the original source for the authoritative text.
This decision lets the association Zones d'Ondes operate a temporary FM radio service called Bruyères FM for one day, on 29 May 2026, from Sotteville-lès-Rouen. The service must use the assigned technical setup, including 102.8 MHz and a maximum radiated power of 50 W, and can only run if international coordination is successful. The group must give ARCOM technical details about the transmitter and antenna system, and later provide the measured frequency deviation if requested. Any use of a subcarrier needs separate approval from ARCOM Caen, and the broadcaster must follow the technical FM rules already in force.
AI-generated summary. May contain errors. Refer to official sources for legal decisions.
Key Changes
- Authorizes a one-day temporary FM radio broadcast called Bruyères FM.
- Assigns the service to 102.8 MHz with a maximum radiated power of 50 W.
- Requires technical reporting to ARCOM and separate approval for any subcarrier use.
Obligations
What this law requires
The association Zones d'Ondes - Agence Associative : Normandie Média Edition Diffusion may operate the temporary FM service 'Bruyères FM' only on the assigned frequency of 102.8 MHz and in accordance with the technical conditions set out in the annex, including the site at Lycée Les Bruyères, a maximum radiated power of 50 W, and the specified antenna height and location.
The authorization may be used only if the international coordination procedures are successfully completed.
The holder must communicate to ARCOM the effective technical description of the installation, including the transmitter type and nominal power and the antenna system.
The holder must provide ARCOM, once available, the measured effective frequency deviation, including the statistical percentage of exceedance above 75 kHz over a minimum period of 15 minutes.
The technical information and frequency-deviation measurement must be produced to ARCOM at any time upon its express request.