Amendment to the Regulation on Storage Activities in the Electricity Market
This amendment changes Article 6(1) of the Regulation on Storage Activities in the Electricity Market. As of its publication date, 19 October 2026, consumers may establish an electricity storage facility if the relevant grid operator gives a suitable connection opinion and the facility is located at the same metering point. If a consumer wants to install storage capacity above its contracted power, it must also install the units and systems required under Article 14 of the Electricity Market Connection and System Use Regulation published in the Official Gazette dated 28 January 2014, No. 28896. The change mainly affects electricity consumers, distributed generation and storage projects, and businesses planning behind-the-meter storage.
AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.
Key Changes
- Article 6(1) now allows consumers to install an electricity storage facility if the relevant grid operator issues a suitable connection opinion and the facility is at the same metering point.
- Consumers installing storage at a capacity higher than their contracted power must comply with the equipment and systems requirement in Article 14 of the Electricity Market Connection and System Use Regulation.
- The amendment links storage installation eligibility to the same-metering-point condition, which narrows acceptable project configurations.
Affected Parties
- Electricity consumers
- Businesses planning behind-the-meter storage systems
- +3 more
Tags
electricity storage · grid connection · same metering point · +3
Related regulations
Türkiye