Regulation Amending the Electricity Market Measurement Systems Regulation
AI-generated summary for informational purposes only. Not legal advice. See the original source for the authoritative text.
This regulation introduces targeted changes to Turkey's Electricity Market Measurement Systems Regulation. Key updates include shifting responsibility for certain measurement devices at distribution network connection points to the distribution system operator. For generation facilities connecting to the transmission system, users must supply meters and modems within their property boundaries, which will then be installed by TEİAŞ. Communication units procured under the TEDAŞ-MLZ/2019-064.A specification can only be installed after 1 March 2026 in accordance with smart metering system rules. Deadlines for bringing certain meters into regulatory compliance for use in transmission fees and settlement calculations have been extended to 1 January 2027. The regulation also updates and removes certain transitional provisions originally set for early 2026.
AI-generated summary. May contain errors. Refer to official sources for legal decisions.
Key Changes
- Responsibility for meters at distribution network connection points changed from 'relevant network operator' to 'distribution network operator'
- Users must supply meters and modems for generation facilities connecting to transmission system within their property boundaries; TEİAŞ performs installation
- Communication units under TEDAŞ-MLZ/2019-064.A specification can only be installed after 1/3/2026 according to Smart Metering System rules
+ 3 more changes with Pro
Obligations
What this law requires
Distribution system operators must assume responsibility for certain measurement devices at distribution network connection points (shifting from 'relevant network operator' terminology)
Users must supply meters and modems within their property boundaries for generation facilities connecting to the transmission system; TEİAŞ must then install these devices
Communication units procured under TEDAŞ-MLZ/2019-064.A specification can only be installed after 1 March 2026 in accordance with smart metering system rules
Meters used in transmission fee calculations, settlement operations and similar regulatory calculations must be brought into compliance with regulatory requirements at connection points by 1 January 2027
Deadline for certain meters to achieve regulatory compliance for transmission fee and settlement calculations is extended to 1 January 2027 (previously 1 January 2026)