Infrastructure

#2026/1189The Network Rail (Tackley Level Crossing) Order 2026

United KingdomStatutory InstrumentLow ImpactView source ↗

This statutory instrument authorises Network Rail’s Tackley railway works under the Transport and Works Act 1992, with the order made on 10 November 2026 and coming into force on 1 December 2026. It allows closure and replacement of the Tackley level crossing, provision of a footbridge with lifts at Tackley railway station, a new bridleway, temporary construction compounds, and related street and highway alterations. It also gives Network Rail powers for temporary street stopping-up, street works, land acquisition of rights, temporary possession, tree lopping, and control over drainage and nuisances within the order limits. Businesses, utilities, landowners, highway authorities, and street authorities in and around Tackley are affected, especially where access, rights of way, apparatus, or land use are changed.

AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.

Key Changes

  • Article 8 authorises the closure and replacement of the Tackley level crossing.
  • Article 9 permits the creation and maintenance of a new highway to serve the development.
  • Articles 3 to 7 allow Network Rail to alter street layouts, carry out street works, temporarily stop up streets, and obtain highway authority or street authority consent, with deemed consent after 28 days in certain cases under articles 3(4) and 5(7).
See 2 more changes with Pro

Affected Parties

  • Network Rail Infrastructure Limited
  • Highway authorities and street authorities in Oxfordshire
  • +3 more

Tags

level crossing closure · Network Rail · street works · +3

Related regulations

United Kingdom