Energy

NRC Draft Interim Staff Guidance on Evaluating Risk Assessments for Risk-Informed Licensing

United StatesNoticeLow ImpactView source ↗

This is a draft Nuclear Regulatory Commission staff guidance, issued on August 21, 2026, that would help NRC reviewers evaluate risk assessments used in regulatory applications. It covers probabilistic risk assessments (PRAs) and other systematic risk evaluations (SREs), and it is meant to supplement existing guidance rather than create a new binding rule. The guidance is aimed at applicants for construction permits, operating licenses, combined operating licenses, standard design approvals, design certifications, and manufacturing licenses under 10 CFR parts 50, 52, and 53. Public comments are due by September 21, 2026, and the NRC identified the draft as not a significant regulatory action under Executive Order 12866.

AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.

Key Changes

  • The NRC will use the draft ISG OAR/DARP-ISG-2026-XX to guide staff reviews of probabilistic risk assessments and other systematic risk evaluations in licensing applications.
  • The guidance emphasizes evaluating the scope, level of detail, acceptable methods, and facility representation of a risk assessment before relying on it in a regulatory decision.
  • The ISG is intended to supplement existing risk-informed decision-making guidance, including RG 1.174, RG 1.200, and RG 1.247, rather than replace them.
See 2 more changes with Pro

Affected Parties

  • Nuclear power plant applicants
  • Advanced reactor developers
  • +3 more

Tags

NRC · risk assessment · probabilistic risk assessment · +3

Related regulations

United States