Proposed FAA Airworthiness Directive for GE90-110B1 and GE90-115B Engines
The FAA is proposing a new airworthiness directive for certain General Electric GE90-110B1 and GE90-115B engines. It was prompted by an aborted takeoff linked to a left engine failure caused by liberation of the interstage high-pressure turbine (HPT) rotor seal rim. The proposal would require operators to determine the recalculated service life of the interstage HPT rotor seal and, depending on the result, replace it with an eligible part; for certain engine populations, operators could instead perform initial and repetitive ultrasonic inspections for cracks. The rule applies when the final AD is issued, but the text provided does not give an effective date.
AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.
Key Changes
- The FAA would require operators of certain GE Model GE90-110B1 and GE90-115B engines to determine the recalculated service life of the interstage HPT rotor seal.
- If the recalculated service life result requires it, operators would have to replace the interstage HPT rotor seal with a part eligible for installation.
- For certain engine populations, operators could use initial and repetitive ultrasonic inspections of the interstage HPT rotor seal for cracks instead of immediate replacement.
Affected Parties
- Airlines operating Boeing aircraft powered by GE90-110B1 or GE90-115B engines
- Aircraft maintenance organizations
- +3 more
Tags
FAA · airworthiness directive · GE90 engines · +3
Related regulations
United States