Renewal of the AP1000 Nuclear Reactor Design Certification
This NRC rule renews the AP1000 design certification and updates the design control document to Revision 20. The change reflects design modifications made during licensing, construction, and operation of Vogtle Electric Generating Plant Units 3 and 4, and it makes the certified design consistent with a current, construction-validated version. The rule applies to parties using or relying on the AP1000 certified design, especially nuclear project developers, utilities, and suppliers. The NRC also issued an environmental assessment supporting the rule.
AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.
Key Changes
- The NRC renews the AP1000 design certification instead of leaving the prior certification period in place.
- The rule incorporates AP1000 Design Control Document Revision 20 into the regulatory framework.
- The certified AP1000 design is updated to reflect changes made during licensing, construction, and operation of Vogtle Electric Generating Plant Units 3 and 4.
Affected Parties
- Nuclear power plant developers using the AP1000 design
- Electric utilities planning or operating AP1000 reactors
- +3 more
Tags
NRC · AP1000 · design certification · +3
Related regulations
United States
FERC notice on Spire MoGas Zone 3 capacity expansion and deadline to intervene or protest
FERC notice of availability of environmental assessment for the Greenup Hydroelectric Project license
Outer Continental Shelf Oil, Gas, and Sulfur Operations: Incorporated Production Measurement and Safety Standards