Environment

Proposed incidental harassment authorization for Navy marine structure maintenance and pile replacement in Puget Sound

United StatesNoticeLow ImpactView source ↗

This NOAA/NMFS notice proposes an incidental harassment authorization under section 101(a)(5)(D) of the Marine Mammal Protection Act for the U.S. Navy’s 2026 Marine Structure Maintenance and Pile Replacement project in Puget Sound, Washington. The notice covers up to 234 pile replacements over a 1-year period at NBK Bangor, Naval Station Everett, and NBK Manchester, using impact and vibratory pile driving and removal. It applies to 10 marine mammal species, with Level B harassment and for some species Level A harassment, but NMFS says no serious injury or mortality is expected. Comments are due by September 17, 2026, and the proposed authorization would be effective for up to 1 year, with possible one-time renewal for another year if requirements are met.

AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.

Key Changes

  • NMFS proposes to issue an incidental harassment authorization under section 101(a)(5)(D) of the Marine Mammal Protection Act for the Navy’s 2026 Marine Structure Maintenance and Pile Replacement project.
  • The proposed activity would allow the replacement of up to 234 structurally unsound concrete or steel piles over a 1-year period at NBK Bangor, Naval Station Everett, and NBK Manchester.
  • The authorization would cover take of 10 marine mammal species through Level B harassment and, for a subset of species, Level A harassment, with no expected serious injury or mortality.
See 2 more changes with Pro

Affected Parties

  • U.S. Navy marine facilities in Puget Sound
  • Maritime construction and pile-driving contractors
  • +3 more

Tags

Marine Mammal Protection Act · NMFS · incidental harassment authorization · +3

Related regulations

United States