Energy

NRC review of Entergy’s requested amendment for Arkansas Nuclear One Unit 2

United StatesNoticeLow ImpactView source ↗

The U.S. Nuclear Regulatory Commission is considering an amendment to Renewed Facility Operating License No. NPF-6 for Entergy Operations, Inc. at Arkansas Nuclear One, Unit 2. The proposed change would revise the technical specifications by modifying the note attached to Surveillance Requirement 4.1.3.1.2 so that Control Element Assembly 29 can be excluded from exercising for the rest of Cycle 32. If approved, CEA 29 would remain out of the exercising surveillance until the planned refueling outage 2R32, which is currently scheduled for September 2027. This is a narrow operating change affecting one reactor unit and one specific control element assembly.

AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.

Key Changes

  • The NRC is reviewing a proposed amendment to Renewed Facility Operating License No. NPF-6 for Arkansas Nuclear One, Unit 2.
  • The amendment would modify the note tied to Technical Specification Surveillance Requirement 4.1.3.1.2.
  • Control Element Assembly 29 would be allowed to remain excluded from exercising surveillance for the remainder of Cycle 32.
See 1 more changes with Pro

Affected Parties

  • Entergy Operations, Inc.
  • Arkansas Nuclear One, Unit 2 operators and maintenance staff
  • +3 more

Tags

NRC · license amendment · technical specifications · +3

Related regulations

United States