Infrastructure

New operating rules for the PS&P railroad drawbridge over the Wishkah River in Aberdeen, Washington

United StatesFinal RuleLow ImpactView source ↗

This Coast Guard rule changes the operating schedule for the Puget Sound and Pacific railroad bridge over the Wishkah River at mile 0.1 in Aberdeen, WA. The bridge will be set to the fully closed-to-navigation position, which means vessels will generally not be able to pass unless a draw opening is arranged. It also requires 24-hour notice for all drawbridge openings and eliminates the requirement for a bridge operator to be on site. The rule applies on 2026-11-06 and mainly affects river users, rail operations, and marine traffic in the area.

AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.

Key Changes

  • The Puget Sound and Pacific railroad bridge over the Wishkah River at mile 0.1 in Aberdeen, WA is moved to the fully closed-to-navigation position.
  • All requested drawbridge openings now require 24-hour advance notice.
  • A bridge operator is no longer required to be on site for bridge openings.
See 1 more changes with Pro

Affected Parties

  • Marine vessels using the Wishkah River
  • Railroad bridge operators and railroad maintenance staff
  • +2 more

Tags

drawbridge · Coast Guard · rail bridge · +3

Related regulations

United States