NRC draft update to decommissioning waste burial cost factors for nuclear power reactors
On 2026-10-22, the U.S. Nuclear Regulatory Commission issued for public comment a draft report, NUREG-1307 Revision 21, on changes in decommissioning waste disposal costs at low-level waste burial facilities. The report explains the formula the NRC accepts for calculating minimum decommissioning fund requirements for nuclear power reactor licensees under NRC regulations. It updates the adjustment factor and the labor, energy, and waste burial escalation factors used in that minimum formula. The practical effect is on nuclear power reactor licensees that must demonstrate adequate decommissioning funding, but the notice itself is informational and does not yet impose a new binding rule.
AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.
Key Changes
- NUREG-1307 Revision 21 is issued as a draft report for public comment on 2026-10-22.
- The report updates the NRC-acceptable formula used to determine minimum decommissioning fund requirements for nuclear power reactor licensees.
- The adjustment factor in the minimum funding formula is revised.
Affected Parties
- Nuclear power reactor licensees
- Nuclear plant owners and operators
- +3 more
Tags
NRC · NUREG-1307 · decommissioning funds · +2
Related regulations
United States
FERC notice on Spire MoGas Zone 3 capacity expansion and deadline to intervene or protest
FERC notice of availability of environmental assessment for the Greenup Hydroelectric Project license
Outer Continental Shelf Oil, Gas, and Sulfur Operations: Incorporated Production Measurement and Safety Standards