FERC notice of Exempt Wholesale Generator, Electric Rate, and Foreign Utility Company filings dated November 18, 2026
This Federal Energy Regulatory Commission notice is a procedural filing notice, not a new rule. It lists Exempt Wholesale Generator filings for Circle City Energy Storage LLC in docket EG27-39-000, Felix 1, LLC in EG27-40-000, and Travertine Solar LLC in EG27-41-000, plus a large set of electric rate filings, including multiple 205(d) tariff filings tied to large-load interconnection, cost recovery, and related tariff revisions. It also lists Foreign Utility Company Status filings for Hesi Renewables Co., Ltd. in FC27-3-000, Hexa India Companies in FC27-4-000, and Hexa Japan Companies in FC27-5-000. Comments or interventions must be filed by the specific comment dates shown for each docket, generally at 5:00 p.m. Eastern time, with dates ranging from 12/7/26 to 1/15/27.
AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.
Key Changes
- The notice records three Exempt Wholesale Generator self-certifications in dockets EG27-39-000, EG27-40-000, and EG27-41-000 for Circle City Energy Storage LLC, Felix 1, LLC, and Travertine Solar LLC.
- The notice lists multiple Electric Rate filings under section 205(d), including filings by San Diego Gas & Electric, PJM Interconnection, Midcontinent Independent System Operator, New York Independent System Operator, Southwest Power Pool, and California Independent System Operator.
- Several filings specifically address large-load interconnection, operational requirements for large computational load, large load cost recovery, and transmission service revisions, indicating active tariff restructuring for high-load customers.
Affected Parties
- Exempt Wholesale Generators and renewable storage developers
- Electric utilities and transmission operators
- +3 more
Tags
FERC · electric rate filings · Exempt Wholesale Generator · +3
Related regulations
United States
FERC notice on Spire MoGas Zone 3 capacity expansion and deadline to intervene or protest
FERC notice of availability of environmental assessment for the Greenup Hydroelectric Project license
Outer Continental Shelf Oil, Gas, and Sulfur Operations: Incorporated Production Measurement and Safety Standards