FRA Notice on Norfolk Southern Petition to Discontinue or Modify a Railroad Signal System
This is a Federal Railroad Administration notice under 49 CFR part 235 and 49 U.S.C. 20502(a) announcing Norfolk Southern Railway Company’s April 19, 2026 petition to discontinue or modify a railroad signal system. Norfolk Southern wants to discontinue legacy cab signal systems on 14 line segments and replace them with a block system enforced by positive train control (PTC), removing redundancy between PTC and cab signaling. FRA says the change is intended to maintain or improve safety by consolidating movement authority supervision and speed enforcement, while reducing conflicting indications and cab-signal failure modes. Public comments are due by November 9, 2026, and FRA will consider late comments only to the extent practicable.
AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.
Key Changes
- FRA published notice of Norfolk Southern Railway Company’s petition to discontinue or modify a railroad signal system under 49 CFR part 235 and 49 U.S.C. 20502(a).
- Norfolk Southern seeks to discontinue legacy cab signal systems on 14 line segments and transition the territory to a block system enforced by positive train control (PTC).
- The petition would remove redundancy between PTC and cab signaling and centralize movement authority supervision and speed enforcement in the existing PTC system.
Affected Parties
- Norfolk Southern Railway Company
- Railroad operators with cab signal and PTC systems
- +3 more
Tags
FRA · railroad signal system · positive train control · +3
Related regulations
United States