Energy

FERC notice on temporary minimum-flow variance for the Swinging Bridge Hydroelectric Project

United StatesNoticeLow ImpactView source ↗

This is a Federal Energy Regulatory Commission notice accepting for filing a temporary variance request for the Swinging Bridge Hydroelectric Project, Project No. 10482-162. The applicant, Eagle Creek Hydro Power, LLC; Eagle Creek Land Resources, LLC; and Eagle Creek Water Resources, LLC, seeks to lower the project minimum flow from 100 cubic feet per second, or inflow if less, but not below 60 cfs, to 50 cfs, or inflow if less. The requested change is tied to maintenance on generating unit no. 2 and the closure of a shared headgate that will temporarily prevent generating unit no. 3 from providing required minimum flows. The variance would last no more than 60 calendar days, tentatively from about December 19, 2026, to January 30, 2027, and comments, protests, or motions to intervene are due by December 9, 2026 at 5:00 p.m. Eastern Time.

AI-generated summary. It may contain errors and is not legal advice. For the authoritative text, see the official source.

Key Changes

  • FERC accepted for filing a temporary variance request for Project No. 10482-162, the Swinging Bridge Hydroelectric Project.
  • The applicant seeks to reduce the minimum flow requirement from 100 cfs, or inflow if less but not below 60 cfs, to 50 cfs, or inflow if less.
  • The temporary flow reduction is requested for maintenance on generating unit no. 2 and the associated closure of a shared headgate with generating unit no. 3.
See 2 more changes with Pro

Affected Parties

  • Eagle Creek Hydro Power, LLC and related project companies
  • Hydroelectric facility operators and maintenance contractors
  • +3 more

Tags

FERC · hydroelectric project · temporary variance · +3

Related regulations

United States