This decision updates the technical authorization for RMC’s FM radio service in the Valence area. It changes the frequency plan and site details for the transmitter, including the broadcast frequency, antenna location, height, and maximum power. RMC and its technical operators need to follow the new limits, and the change only takes effect after international coordination is completed successfully.

AI-generated summary. May contain errors. Refer to official sources for legal decisions.

Key Changes

  • Replaces Annex XVII of the 2021 authorization decision for RMC.
  • Sets a new FM frequency for Valence at 104.3 MHz.
  • Updates transmitter site, antenna height, maximum power, and horizontal radiation limits, subject to successful international coordination.

Obligations

What this law requires

high

SAM Radio Monte-Carlo must operate the RMC FM service in the Valence area using the updated technical parameters set in Annex XVII: frequency 104.3 MHz, site at chemin rural de la Chavas, Saint-Romain-de-Lerps (07), site altitude 631 m NGF, antenna height 39 m above ground, and maximum effective radiated power of 1 kW.

SAM Radio Monte-Carlotechnical operators of the RMC FM transmission site
after the decision takes effect and once international coordination is completed successfully
operational
high

The transmitter's horizontal radiation pattern must respect the specified attenuation limits by azimuth as set out in Annex XVII, relative to the maximum effective radiated power.

SAM Radio Monte-Carlotechnical operators of the RMC FM transmission site
after the decision takes effect and once international coordination is completed successfully
operational
high

The modified authorization for the RMC service applies only subject to the successful outcome of international coordination procedures; operations under the new parameters should not be treated as fully effective until that condition is satisfied.

SAM Radio Monte-Carloregulatory and technical operators involved in the authorization
upon favorable completion of international coordination procedures
licensing
low

The decision must be notified to SAM Radio Monte-Carlo.

French broadcasting regulator / issuing authority
upon issuance of the decision
disclosure
low

The decision must be published in the Journal officiel de la République française.

French broadcasting regulator / issuing authority
upon issuance of the decision
disclosure

Affected Parties

SAM Radio Monte-Carlo (RMC)Technical broadcasting operators and frequency coordinators

Tags

radio,fm broadcasting,frequency allocation